Vale of Leven Golf Club, Suds Bond Path
Our task was to excavate the existing pathway and re-direct it away from the Green.
Our task was to excavate the existing pathway and re-direct it away from the Green.
Our contract was to Sand Slit at 2 metre centres on Five Fairways using the AFT Whizz Wheel.
New Rootzone was applied and used the Mumby Laser-Levelled Grading Box pulled by a Bunker Rake to level the surface.
A new pitch construction at Monifieth Learning Campus for DOE Sports.
Using the Koro Field TopMaker, we removed the top 70mm and replaced it by spreading 500 tonnes of new Rootzone onto the pitch.
We commenced works on the Bunker Fairways as we had already completed the Green Side ones over the last few years.